Enterprise Engineer is designed to
meet the majority of Owner/Operator engineering document management
requirements.
We recognize that each customer has unique challenges shaped
by specifc industry regulations, terminology, business
rules and work practices.
The following case studies provide examples of how Enterprise Engineer has been configured to
meet industry requirements and overcome customer
challenges.
AS-BUILT DRAWINGS FOR OPERATIONS
A major oil sands operator implemented Enterprise Engineer to
manage its documents, drawings and associated processes and to
ensure as-builts are available to Operations & Maintenance.
Read
more >>
ALBERTA OIL SANDS
Enterprise Engineer was implemented to manage the documents,
drawings and maintenance records for a multi billion dollar capital
project. The objective was to provide accurate, validated
documentation to the right people, at the right time, to ensure the
right decisions are made.
Read more
>>
ACCELERATING PROJECTS
A Canadian provincial utility has deployed Enterprise Engineer
to accelerate engineering projects and manage hydro generation
assets replacing a combined manual / mainframe document management
system.
Read
more >>
BUILDING SURVEY COSTS REDUCED
One of the world's most respected medical research centers
devoted to cancer patient care, implemented Enterprise Engineer to
manage its documents, drawings and associated processes.
Read
more >>