An infographic including a study by The US National Institute of Standards and Technology (NIST) showing that poor handover of data and documentation from a construction project can result in 66% of the total cost of rework, errors and downtime are incurred in the operations phase of a facility or asset. Estimates show this to be an annual cost to US industry in excess of $15.8Bm.
If you would like a copy of the Infographic as a PDF (right click and select 'save as') - alternatively use the share buttons on the left hand panel. Embed this on your webpage, copy the code at the bottom of the page
Copy the code below to place a thumbnail on your webpage or blog with a link back to this page.
Inadequate Data Interoperability