Infographic - The Cost of inadequate Interoperability -

Calculating the cost of data interoperability between projects and operations based on a US National Institute of Standards and Technology (NIST).

An infographic including a study by The US National Institute of Standards and Technology (NIST) showing that poor handover of data and documentation from a construction project can result in 66% of the total cost of rework, errors and downtime are incurred in the operations phase of a facility or asset. Estimates show this to be an annual cost to US industry in excess of $15.8Bm.

Data Interoperability

 

If you would like a copy of the  Infographic as a PDF (right click and select 'save as') - alternatively use the share buttons on the left hand panel.

Embed this on your webpage, copy the code at the bottom of the page

Copy the code below to place a thumbnail on your webpage or blog with a link back to this page.

 

 

Whitepaper

The project is over, but is the risk? The Project is over but is the risk?
An exploration of how document control can reduce risk and cost during the Operational & Maintenance (O&M) phase.